Case Studies
Alpro Foods - Kettering
Installation of a prefabricated steam header was successfully completed within a scheduled 12-hour shutdown period, demonstrating the significant advantages of off-site fabrication in minimising factory production downtime.
The steam header was fabricated from 16-inch pipework and underwent full Non-Destructive Testing (NDT) and pressure testing prior to installation to ensure integrity and compliance. All welding activities were performed by ASME Section IX qualified personnel in accordance with approved company welding procedures, fully satisfying the requirements of the insurance inspectors.
Cranswick - Hull
A new steam boiler plantroom was installed to serve a recent building extension on site, delivering a fully integrated and compliant steam generation solution to support the facility’s expanded operational requirements.
The installation encompassed all associated mechanical, electrical, and control systems, ensuring seamless integration with the existing infrastructure. The plantroom was designed and constructed in accordance with current industry standards and regulatory requirements, providing a safe, efficient, and reliable steam supply for the extended facility.
Cranswick - Norwich
Installation of plantroom and chiller pipework was completed to provide a robust and efficient cooling distribution system, fully integrated with the site’s existing infrastructure.
The works included the fabrication, installation, and commissioning of all associated pipework systems, valves, and ancillary components within the plantroom and connected areas. All installation activities were carried out in accordance with relevant industry standards and project specifications, ensuring system integrity, operational reliability, and long-term performance.
Fischer Farms
A new steam boiler plantroom was installed to serve a recent building extension on site, delivering a fully integrated and compliant steam generation solution to support the facility’s expanded operational requirements.
The installation encompassed all associated mechanical, electrical, and control systems, ensuring seamless integration with the existing infrastructure. The plantroom was designed and constructed in accordance with current industry standards and regulatory requirements, providing a safe, efficient, and reliable steam supply for the extended facility.
Natwest
Installation of a full stainless steel pipework system was undertaken to distribute heating and cooling from the Air Source Heat Pump (ASHP) plant to the building’s distribution risers and Air Handling Units (AHUs) throughout the office facility.
The scope included fabrication, installation, and commissioning of the complete stainless steel network, selected for durability, corrosion resistance, and long-term performance. All works were carried out in accordance with relevant industry standards and project specifications, ensuring system integrity, hydraulic efficiency, and reliable operation across all areas of the building.